The Project
Nuon is proposing to build a seven turbine wind farm on the site of the former RAF Harrington airfield.
| Number of Turbines | 7 |
| Generating Capacity | 14MW |
| Tower Height | 85m |
| Blade Length | 41m |
| Total Height | 126m |
| Estimated Annual Electricity* | 36,000,000kWh |
| Equivalent Homes | 7,700 |
| Estimated Annual CO2 Saving | 13 - 31kt/yr |
*Based on:
a capacity factor of 29%
an average household consumption of 4700kWh [BWEA]
CO2 emissions of 370g/kWh from Gas powered generation and 860g/kWh from Coal powered generation (as agreed between the ASA and BWEA)